Reconstruction of the Benzene Section Building at PJSC "KAMET-STEEL" Completed
Kamet Steel – large-scale overhaul of turbo blower #1
У ТЕЦ Каметсталі капітально ремонтують обладнання для приготування хімічно очищеної води
Central GOK implements energy project resulting in annual savings of UAH 10 million
Kamet-Steel overhauls mixer
Central GOK got a significant economic effect from the implementation of the energy saving project
Zaporizhstal shut down blast furnace #4 for major overhaul
Power engineers at Kamet Steel are overhauling the air separation unit
Effective technology: steelmakers expand range of steels that can be produced with pre-heating
At the crushing plant of Central GOK, the classification section was restored
Kamet Steel's roller operators expended the range of round sections
At Kamet Steel, electricity consumption during blast furnace gas injection has been reduced by 60%
Zaporizhstal blows up Blast Furnace #2 after overhaul
PJSC "Kamet-Steel" Rolling Mills workers have mastered the production of a new SVP-33 section for Ukrainian miners
PJSC "Kamet-Steel" is relining the Basic Oxygen Furnace #1
The power workers of Kamet-Stal restore a cable overpass for reliable power supply of coke chemical production
By continuing to browse metinvest.media you confirm that you have read the Terms of Use of the site and agree to the use of cookies.
Share