<div class="modal fade" style="display: none;" data-js-unit="AjaxWindow" data-js-unit-options="{&quot;mode&quot;:&quot;custom&quot;}"> <div class="modal-dialog"> <div data-ajax-url="/en/page/search" data-js-unit="AjaxUnit" data-js-unit-options="{&quot;successAction&quot;:&quot;setHtml&quot;,&quot;errorAction&quot;:&quot;alert&quot;}" data-ajax="ajax-window-loader" data-ajax-data=""> <div data-state="initial"> </div> <div data-state="loading" style="display: none;"> <div class="modal-content"> <div class="modal-header"> <button type="button" class="close" data-dismiss="modal" aria-label="Close"> <span aria-hidden="true">×</span> </button> <h4 class="modal-title"></h4> </div> <div class="modal-body"> <div class="h1 text-center">Loading ...</div> </div> </div> </div> <div data-state="success" style="display: none;"> </div> </div> <!-- /.modal-content --> </div> <!-- /.modal-dialog --> </div>
<div class="video_card" data-js-unit="ui/VideoCard"> <div class="thumb_rel" data-block="thumb"> <div class="play_btn" data-block="play"></div> <table class="thumb"><tr><td valign="middle"> <img data-block="image" width="100%"> </td></tr></table> </div> <div class="video" data-block="video"> <iframe frameborder="0" allowfullscreen width="100%" height="100%"></iframe> </div> </div>
  • Metallurgy Incognita
  • Business
  • Ecology
  • Society
  • Team
  • Blogs
In touch 24/7
online@metinvestholding.com m.me/metinvest
УКР
    • Metallurgy Incognita
    • Business
    • Ecology
    • Society
    • Team
    • Blogs
  • 25 June
  • Войти
    Via:
    Forgot your password?
УКР
Heroes Among Us
5/15/2025

Zaporizhzhia Coke veteran told us about the path of returning from the front line to civilian life

Metinvest's enterprises have a program for the reintegration of veterans, because more than a thousand of the company's workers have already returned from the front to production.Mykola Bobal, a gas man of Zaporizhzhia Coke coke ovens, had joined the ranks of the Armed Forces of Ukraine in March 2022."At the beginning, as inexperienced soldiers, we were sent to the Maryinka area – there we gained experience and united well. Then there were very "hot" front lines and heavy battles – Bakhmut, Avdiivka," says Mykola BOBAL.The man reluctantly remembers what he had to go through. He talks only about his sworn brothers."The sworn brothers in our brigade were excellent – reliable, sociable, responsible. Were we scared? Of course, we were. But despite this, there was no panic, because we could rely on each other, felt a reliable support next to each other.There were cases when it was necessary to evacuate the wounded from the front line, but this could not be done during the shelling. But we
CSR
5/15/2025

With the support of Zaporizhstal, Zaporizhzhia educators and psychologists mastered the method of hibuki therapy

In Zaporizhzhia, the third season of training educators and psychologists in the method of psychological assistance to children within the framework of the international project "Hibuki Therapy" has come to an end. The project is implemented by the NGO "Zaporizhzhia. Platform of Joint Actions" with the financial support of Metinvest Group and Zaporizhstal in cooperation with the Department of Education and Science of Zaporizhzhia City Council.Zaporizhzhia psychologists, teachers and educators from schools and kindergartens, as well as psychologists from the public sector received certificates of successful completion of the training course within the framework of the Hibuki Therapy psychological assistance project and a therapeutic toy in the form of a dog, which is the main therapy tool.The solemn event, which took place in early May 2025, had been preceded by a theoretical course on teaching the methodology and practical work with children in the form of individual meetings and grou
Media about us
5/15/2025

Half of Generation In-House by 2030. How the War and CBAM Are Changing Metinvest's Energy Strategy – Group COO Oleksandr Myronenko for Forbes

Metinvest Group is investing over US$44 million in its own power sources – gas piston and solar power plants – to safeguard production against wartime energy risks. In April, the Group launched its first gas piston power plants, with more to follow by the summer. The next stage will involve constructing nearly 40 MW of solar power generation. The plan is to meet up to half of the Group’s needs with in-house capacity by 2030. Oleksandr Myronenko, Metinvest’s Chief Operating Officer, spoke to Forbes Ukraine about the investments, the challenges and the energy strategy.Myronenko said that the Group launched its first gas piston power plant on 15 April. Four units with a combined capacity of 10 MW will strengthen the energy security of the Kamet Steel metallurgical plant, which requires up to 150 MW in total.By the end of May, Metinvest plans to commission an additional 19 MW of gas piston units at Northern Iron Ore and Central Iron Ore. The total investment in gas generation in 2025 will
Career
5/14/2025

Crane operator Valentyna Prokhorchuk: "The enterprise is more than just a job for our family"

For everyone, the word "mother" evokes the warmest associations such as love, care, and strength. Mothers are with us during our most important moments, and from childhood they invest all their knowledge and wisdom in us, to which we come back throughout the entire life. For mothers at Zaporizhstal, in addition to all this, they also instil a love for metallurgy. Valentyna Prokhorchuk's story embodies all of these qualities."My sister worked as a crane operator at one of the enterprises in Zaporizhzhia. When I was 11, she took me to the plant and showed me her workplace and the shop. So much time has passed, but I still remember that day and how impressed I was by that huge machine," shares Valentyna.She started working at the enterprise as a crane operator in 1988, immediately after completing her professional training. From her first working day until today, she has been working at the mould train preparation shop, so she knows it inside and out. Today, almost her entire family work
Heroes Among Us
5/14/2025

Irrecoverable loss: the colleagues remember with sadness the deceased Zaporizhstal employee Dmytro Alimov

In December 2023, terrible news came about the death of the track foreman of the railway transport department, Dmytro Alimov.38-year-old Dmitry Alimov had worked in the railway transport department of Zaporizhstal for almost 14 years. He had begun his career as part of the present Zaporizhzhia Casting and Mechanical Plant. Later, he had joined the RTD team as a track fitter. He had worked hard, studied, and in a few years became a track foreman, responsible for timely and high-quality repairs of railway tracks and turnouts. Responsible and proactive, Dmytro had taken an active part in the system of submitting proposals that improved the work.Dmytro's life had changed radically in April 22, when he joined the ranks of the Armed Forces of Ukraine. Together with his sworn brothers, Dmytro Alimov had held the defense at the Donetsk front line, went through many heavy battles, was awarded the Order "For Courage" of the III degree. Unfortunately, in December 2023, the man had died defending
Safety
5/14/2025

Metinvest Northern Iron Ore conducted audits and discussed key occupational safety issues

A roundtable discussion with representatives of the Main Department of the State Labour Service in Dnipro Region was held at Northern Iron Ore. Trade union leaders from Northern Iron Ore's shops, specialists from the occupational safety and industrial safety directorate, HR department specialists from Metinvest Iron Ore, and employees of the corporate fire station at Northern Iron Ore participated in this discussion. The seminar was organised as part of the occupational safety week events, traditionally held in the lead-up to World Day for Safety and Health at Work.The roundtable discussion focused on current occupational safety issues amid wartime conditions. State Labour Service inspectors conducted a seminar covering topics such as employee work permits, workplace certification, pre-shift medical examination, and more.Ihor RAPINA, head of the Occupational Safety Department of the Directorate for Occupational Safety, Industrial Safety, and Environmental Protection at Metinvest Iron
CSR
5/13/2025

In Zaporizhzhia, the project for the rehabilitation of the military and veterans "Free Waves" was continued

The Free Waves swimming rehabilitation project had started in Zaporizhzhia in July 2024. As part of it, war veterans and active military personnel are engaged free of charge according to the method of the Olympic medalist in swimming Denys Sylantiev. The effectiveness of such rehabilitation amazed everyone, so the project continues."When our partners saw how effective the result was, how much our project helps in rehabilitation, how many military personnel join us, it was decided to extend it at least until the end of the year in both Zaporizhzhia and Kryvyi Rih.We want to expand – to cover more cities, to add swimming pools, because there are really a lot of people who want to join the project. These are not only veterans who come for a few days, and in 5-6 days they need to recover and continue their service," said Denys SYLANTIEV.During the existence of the Free Waves project, many veterans and active military personnel have undergone rehabilitation. Some attend sessions regularly,
Career
5/13/2025

Робота є: актуальні вакансії Метінвесту-2025. Випуск 05

На шляху до перемоги кожен робить внесок на своєму місці. На полі бою або на роботі. З перших днів повномасштабного вторгнення співробітники Групи Метінвест наближаюсь перемогу України, виправляючи сталь для ЗСУ та забезпечуючи податкові надходження в бюджети всіх рівнів. Публікуємо найактуальніші вакансії в кожному з міст присутності Метінвесту – Запоріжжі, Кривому Розі, Кам'янському та інших. Розмір заробітних плат вказаний з урахуванням преміальної частини і до оподаткування. Поділіться вакансіями зі своїми знайомими та близькими, запрошуйте їх приєднатися до команди Метінвесту.Запоріжсталь Горновий печі 38 700 грнРозливальник сталі34 100 грнДозувальник 34 000 грн Відділ кадрів: Запоріжжя, Південне шосе, 72 (Пн-Пт з 8:30 до 17:00), +380675453674, +380676139207ЗапоріжвогнетривСлюсар-ремонтник 31 800 грнСадчик у печі та на тунельні вагони27 100 грнШихтувальник25 600 грнВідділ кадрів: Запоріжжя, Північне шосе, Теплична, 22б/1 (Пн-Пт з 8:30 до 17:00), +380674152981ЗапоріжкоксДверевий28
Metinvest Polytechnic
5/12/2025

Students of Metinvest Polytechnic won in the all-Ukrainian case challenge "Plant Games"

A team of Metinvest Polytechnic students called "Inventors" achieved two prize-winning places in the finale of the all-Ukrainian case challenge "Plant Games," organised by the UGEN platform. The competition brought together 56 of the best student teams from all over the country, and the representatives of Metinvest Polytechnic showed the best results, taking first and second places.Beside the "Inventors," another team called "Steel Brains" represented the university, which entered the TOP 20. The performance of both teams serves as proof of the high-quality engineering education and motivation of the mining and metallurgical university's students.Two cases – two awards1st place: the case for MHP company, dedicated to modernising the Vinnytsia poultry farm's power supply system. The students offered an integrated solution with a microgrid, backup power sources, automated control, and a 3D model of the system. Due to the project, the enterprise could potentially avoid production shutdow
More Than Steel
5/12/2025

Metinvest to Supply up to 500 Tonnes of Rolled Product for Main Water Pipeline Construction in Mykolaiv Region

The construction of a main water pipeline continues in Mykolaiv region. Metinvest-SMC is the partner of this important infrastructure project and will supply up to 500 tonnes of steel products.The total length of the future water pipeline will be 67.8 kilometres. It will have a throughput capacity of up to 120,000 cubic meters of water per day, designed to meet the needs of Mykolaiv. Autostrada is the main contractor for the project, while Metinvest-SMC is supplying rebars of various sizes.The work has been phased, beginning in March with the first section (18.4 km in length), followed in April by the start of construction on the second (22.9 km) and third (26.5 km) sections. To accelerate the process and achieve completion in an extremely short time – just five months – over 1,000 specialists and more than 100 units of modern equipment are operating around the clock at the construction site.FIGUREMetinvest-SMC will supply up to 500 tonnes of steel products for the construction of the
← 1 ... 6 7 8 9 10 ... 541 →

By continuing to browse metinvest.media you confirm that you have read the Terms of Use of the site and agree to the use of cookies.

  • Metallurgy Incognita
  • Business
  • Ecology
  • Society
  • Team
  • Blogs
На зв'язку 24/7
online@metinvestholding.com m.me/metinvest Політика конфіденційності
Developed by D2

Share

Перейти к адвент-календарю