Rehabilitation Department Is Being Prepared for Opening at Pokrovsk Hospital with Support of Metinvest
The arrangement of the rehabilitation department at Pokrovsk Clinical Hospital for Intensive Care began last year. The hospital purchased the necessary equipment, and Metinvest Group undertook a large amount of repair work and the complete restoration of the old building.The department is located on the second floor, where the administrative block used to be. It is expected that there will be several dozen different offices and four large wards. Everything has been renovated: walls, ceilings and floors.– Only the outer walls remained of the old building structures, – Maksym LOBYNTSEV, director of New Heat Technologies LLC, said. – New walls and ceilings were erected, the heating system, water supply, sewage system, electricity, lighting and much more were replaced. Due to the fact that the floor has wooden joists, it was impossible to fill it with concrete. Therefore, it was decided to renovate all wooden structures and cover them with medical linoleum.The arrangement of such a depart